A platform for research: civil engineering, architecture and urbanism
Missouri pacific improves main stem in Kansas
Completion of 3-yr construction program, costing $6,500,000, permitting faster schedules with heavier train loading; grade and curvature reductions; sequence of various construction operations.
Missouri pacific improves main stem in Kansas
Completion of 3-yr construction program, costing $6,500,000, permitting faster schedules with heavier train loading; grade and curvature reductions; sequence of various construction operations.
Missouri pacific improves main stem in Kansas
Ry Age
Railway Age ; 94
1933
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Water Main Cleaning in Kansas City, Missouri
Wiley | 1921
|Electric Pumpage in Kansas City, Missouri
Wiley | 1929
|Timbering methods in Missouri-Kansas district
Engineering Index Backfile | 1908
|Operation of Missouri River main stem reservoirs
Engineering Index Backfile | 1957
|