A platform for research: civil engineering, architecture and urbanism
Modernization of port; some 5000 precast concrete piles used for docks; three miles of breakwater; dredging 2,200,000 cu yds; 120-ft piling in trestles; silt and sand layers cause serious difficulties; tunnel method used for blasting; tits and winzes found most practical for carrying charges; experience in blasting itemized.
Modernization of port; some 5000 precast concrete piles used for docks; three miles of breakwater; dredging 2,200,000 cu yds; 120-ft piling in trestles; silt and sand layers cause serious difficulties; tunnel method used for blasting; tits and winzes found most practical for carrying charges; experience in blasting itemized.
Improving peruvian port of callao
Excavating Engr
Wee, S.A. (author)
Excavating Engineer ; 27
1933
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 2004
Engineering Index Backfile | 1929
|Development of new port of Callao
Engineering Index Backfile | 1929
Port Development - Peru: DP World's new facility at Callao' starts Peru's port transformation
British Library Online Contents | 2008
Identifying disappeared historic buildings of port of Callao using georeferencing
DOAJ | 2023
|