A platform for research: civil engineering, architecture and urbanism
Earthwork all-American canal
Specifications, schedules and drawings of earthwork, all-American Canal station 1130 to station 1860, Boulder Canyon Project. Arizona-California-Nevada; project involves over 20,000,000 cu yd of common excavation and 484,000 cu yd of solid rock excavation. ($0.50.)
Earthwork all-American canal
Specifications, schedules and drawings of earthwork, all-American Canal station 1130 to station 1860, Boulder Canyon Project. Arizona-California-Nevada; project involves over 20,000,000 cu yd of common excavation and 484,000 cu yd of solid rock excavation. ($0.50.)
Earthwork all-American canal
U S Bur Reclamation -- Specifications
1933
12 pages
3 Supp plates
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Earthwork all-American canal station 245 to station 1860
Engineering Index Backfile | 1934
Earthwork and structures -- Vale main canal station
Engineering Index Backfile | 1930
Earthwork on construction of the Dnepr-Donbass canal
Online Contents | 1975
|Earthwork on construction of the Dnepr-Donbass canal
Springer Verlag | 1975
|Earthwork, canal lining, tunnel and structures north branch canal, division no. 2
Engineering Index Backfile | 1929