A platform for research: civil engineering, architecture and urbanism
Methods employed on building power development on Lievre river, capacity of 134,000 hp on 185-ft head, including power tunnel 6060 ft long and 25 ft in diam; excavation, concreting and grouting, equipment employed, time taken, provisions for power, handling materials, and pumping during construction. Before Eng Inst Canada.
Methods employed on building power development on Lievre river, capacity of 134,000 hp on 185-ft head, including power tunnel 6060 ft long and 25 ft in diam; excavation, concreting and grouting, equipment employed, time taken, provisions for power, handling materials, and pumping during construction. Before Eng Inst Canada.
Construction of masson power development
Eng J
Serson, H.V. (author)
Engineering Journal ; 16
1933
9 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
André Masson beim Zeichnen, Berlin 1964
TIB AV-Portal | 1965
|Sozialer Wohnungsbau in Paris - Hamonic + Masson, Paris
Online Contents | 2012
Sozialer Wohnungsbau in Paris Hamonic + Masson, Paris
British Library Online Contents | 2012
Hamonic + Masson - Student Housing, Paris, 2004-08
Online Contents | 2011
Harber, Masson & Associates: Burgerzentrum in Nthlungwane, Südafrika
Online Contents | 1995