A platform for research: civil engineering, architecture and urbanism
Tubular steel towers 52 ft. high carry stiff-leg Derrick
Construction of unusual stone-handling rig designed for erection of Pittsburgh church; steel grillage on light floor supports pipe towers; capacity of derrick is 4 tones on radius of 50 ft, or 3 tons on 75-ft radius.
Tubular steel towers 52 ft. high carry stiff-leg Derrick
Construction of unusual stone-handling rig designed for erection of Pittsburgh church; steel grillage on light floor supports pipe towers; capacity of derrick is 4 tones on radius of 50 ft, or 3 tons on 75-ft radius.
Tubular steel towers 52 ft. high carry stiff-leg Derrick
Eng News-Rec
Streithof, C.P. (author)
Engineering News-Record ; 110
1933
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Suspension-bridge towers erected with guy derrick
Engineering Index Backfile | 1935
Mount derrick on three towers to set all stone
Engineering Index Backfile | 1929
|Stiff-leg Derrick solves mud problem on St.Louis parking structure
Engineering Index Backfile | 1960
|ASSEMBLY JIG OF STEEL DERRICK, AND ASSEMBLY METHOD OF STEEL DERRICK
European Patent Office | 2021
|