A platform for research: civil engineering, architecture and urbanism
Slide in belle fourche dam follows reservoir drawdown
Slide, 600 ft long, on upstream face of dam; repairs require 20,000 cu yd of earth and replacement of 1500 concrete paving blocks.
Slide in belle fourche dam follows reservoir drawdown
Slide, 600 ft long, on upstream face of dam; repairs require 20,000 cu yd of earth and replacement of 1500 concrete paving blocks.
Slide in belle fourche dam follows reservoir drawdown
Eng News-Rec
Engineering News-Record ; 111
1933
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The belle fourche dam, belle fourche project, South Dakota
Engineering Index Backfile | 1906
|Construction of the Belle Fourche dam
Engineering Index Backfile | 1910
|Engineering Index Backfile | 1912
|Method of repairing revetment on Belle Fourche Dam
Engineering Index Backfile | 1918
|The Belle Fourche irrigation works, South Dakota
Engineering Index Backfile | 1906
|