A platform for research: civil engineering, architecture and urbanism
Madden dam aggregate handled by mile-long aerial tramway
Aerial tramway capable of delivering 225 tons of gravel per hr to screening plant for construction of concrete dam 900 ft long and 220 ft max height; gravel loaded by Bucyrus-Monighan 2 1/2-yd walking dragline into 5 cu yd side-dump cars operating on narrow-gage track.
Madden dam aggregate handled by mile-long aerial tramway
Aerial tramway capable of delivering 225 tons of gravel per hr to screening plant for construction of concrete dam 900 ft long and 220 ft max height; gravel loaded by Bucyrus-Monighan 2 1/2-yd walking dragline into 5 cu yd side-dump cars operating on narrow-gage track.
Madden dam aggregate handled by mile-long aerial tramway
Construction Methods
Ackerman, A.J. (author)
Construction Methods ; 15
1933
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
ASCE | 2021
|ASCE | 2021
|Material handled rapidly on 4.58-mile concrete road job
Engineering Index Backfile | 1928
The aerial passenger tramway from Lana to Vigiljoch, Tyrol
Engineering Index Backfile | 1913
Dossier: Tramway - << Un projet de tramway est d'abord une vision politique >>
Online Contents | 2000
|