A platform for research: civil engineering, architecture and urbanism
George Washington bridge: Construction of substructure
Construction methods used on foundations for main piers and anchorages for cables; plant layout for transporting, mixing, and placing concrete; concrete proportioning and mixing. (See also - n 5 (discussion) May p 894-5; Am Soc Civ Engrs -- Trans v 97 paper n 1822 1933 p 206-41, (discussion) 434-5)
George Washington bridge: Construction of substructure
Construction methods used on foundations for main piers and anchorages for cables; plant layout for transporting, mixing, and placing concrete; concrete proportioning and mixing. (See also - n 5 (discussion) May p 894-5; Am Soc Civ Engrs -- Trans v 97 paper n 1822 1933 p 206-41, (discussion) 434-5)
George Washington bridge: Construction of substructure
Am Soc Civ Engrs -- Proc
Case, M.B. (author)
1933
36 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
George Washington Bridge: Construction of Substructure
ASCE | 2021
|George Washington bridge: Construction of substructure
Engineering Index Backfile | 1933
|George Washington bridge: construction of steel superstructure
Engineering Index Backfile | 1933
|George Washington bridge: construction of steel superstructure
Engineering Index Backfile | 1933
|Construction of lower deck of George Washington bridge
Engineering Index Backfile | 1961
|