A platform for research: civil engineering, architecture and urbanism
Design and construction of French king bridge on Mohawk trail route across Connecticut river, Massachusetts
Steel continuous spandrel braced arch of 460 ft span; total length of highway bridge 782 ft; total cost $385,000. (see also Roads and Streets v 76 n 9 Sept 1933 p 332-6)
Design and construction of French king bridge on Mohawk trail route across Connecticut river, Massachusetts
Steel continuous spandrel braced arch of 460 ft span; total length of highway bridge 782 ft; total cost $385,000. (see also Roads and Streets v 76 n 9 Sept 1933 p 332-6)
Design and construction of French king bridge on Mohawk trail route across Connecticut river, Massachusetts
Boston Soc Civ Engrs -- J
Kleinert, Jr., A.E. (author)
1933
19 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1933
|Unique bridge construction across Connecticut river
Engineering Index Backfile | 1956
|Mohawk river bridge, Schenectady, N.Y.
Engineering Index Backfile | 1912
Operation of the Mohawk River bridge dams
Engineering Index Backfile | 1913
|Reconstructing the Mohawk trail with bituminous macadam
Engineering Index Backfile | 1929