A platform for research: civil engineering, architecture and urbanism
Concrete arch ribs of rogue river bridge decentered by built-in jacks
Use of FREYSSINET method of arch decentering and stress adjustment for first time in United States in construction of Oregon highway bridge, comprising seven 230-ft spans.
Concrete arch ribs of rogue river bridge decentered by built-in jacks
Use of FREYSSINET method of arch decentering and stress adjustment for first time in United States in construction of Oregon highway bridge, comprising seven 230-ft spans.
Concrete arch ribs of rogue river bridge decentered by built-in jacks
Construction Methods
Paxon, G.S. (author) / Dresser, M. (author)
Construction Methods ; 15
1933
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Repairing concrete arch ribs in Klamath river bridge
Engineering Index Backfile | 1927
Jacks on barge erect arch bridge
Engineering Index Backfile | 1958
|A reinforced concrete arch bridge designed with cantilever ribs
Engineering Index Backfile | 1911
Concrete lifting pouring construction method for steel tube arch bridge arch ribs
European Patent Office | 2015
|Application of Freyssinet method of concrete arch construction to Rogue river bridge in Oregon
Engineering Index Backfile | 1933