A platform for research: civil engineering, architecture and urbanism
Three new thames bridges
Bridges are all constructed in reinforced concrete; Hampton Court bridge is formed in three spans of 90, 105, and 90 ft respectively; at Twickenham three river spans are 98 ft 4 in., 103 ft 4 in. and 98 ft 4 in. in length; approach is 688 ft long, one-half of which is viaduct; bridge at Chiswick has central span of 150 ft, side spans 125 ft and two land spans 61 ft 6 in.
Three new thames bridges
Bridges are all constructed in reinforced concrete; Hampton Court bridge is formed in three spans of 90, 105, and 90 ft respectively; at Twickenham three river spans are 98 ft 4 in., 103 ft 4 in. and 98 ft 4 in. in length; approach is 688 ft long, one-half of which is viaduct; bridge at Chiswick has central span of 150 ft, side spans 125 ft and two land spans 61 ft 6 in.
Three new thames bridges
Engineer
Engineer ; 156
1933
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
TIBKAT | 2022
|Engineering Index Backfile | 1933
Engineering Index Backfile | 1931
|British Library Online Contents | 1993
Engineering Index Backfile | 1931
|