A platform for research: civil engineering, architecture and urbanism
Construction of breakwater or training wall, 10,000 ft long, forming part of Federal project for Richmond Harbor, Calif; depth of water in which wall was built is 6. ft at mean low low water; bottom is soft mud, underlain by stiff blue clay; top of clay is 25 ft below mean low low water; at shore end, deepening to 58 ft at outer end.
Construction of breakwater or training wall, 10,000 ft long, forming part of Federal project for Richmond Harbor, Calif; depth of water in which wall was built is 6. ft at mean low low water; bottom is soft mud, underlain by stiff blue clay; top of clay is 25 ft below mean low low water; at shore end, deepening to 58 ft at outer end.
Rubble breakwater founded on deep mud
Western Construction News Highways Bldr
Pond, H.S. (author)
1933
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
S-Curve Rubble Mound Breakwater
Springer Verlag | 2021
|S-Curve Rubble Mound Breakwater
TIBKAT | 2021
|RUBBLE-MOUND BREAKWATER CONSTRUCTION SIMULATION
TIBKAT | 2020
|Rubble-mound breakwater failure modes
British Library Conference Proceedings | 1995
|7.7 Composite-berm rubble mound breakwater
British Library Conference Proceedings | 2005
|