A platform for research: civil engineering, architecture and urbanism
44-mile water tunnel hits its first snag
Wet seam was hit during construction of West Delaware tunnel, under construction for New York City Board of Water Supply; 40 ft long concrete plug, with grout pumped into seam after concrete set, was placed by setting vertical circular form, with grout pipes in place before pour; eight days and 16,000 bags of grout were needed.
44-mile water tunnel hits its first snag
Wet seam was hit during construction of West Delaware tunnel, under construction for New York City Board of Water Supply; 40 ft long concrete plug, with grout pumped into seam after concrete set, was placed by setting vertical circular form, with grout pipes in place before pour; eight days and 16,000 bags of grout were needed.
44-mile water tunnel hits its first snag
Eng News-Rec
Engineering News-Record ; 157
1956
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The National Museum of the American Indian hits a snag
British Library Online Contents | 1999
Asia: Ouy Tolgoi Begins Concentrate Shipments, Hits Snag in Underground Development Funding
Online Contents | 2013
Engineering Index Backfile | 1958
|Two-mile tunnel almost complete
Engineering Index Backfile | 1959