A platform for research: civil engineering, architecture and urbanism
Chute spillway preserves St. Anthony falls
Reinforced concrete spillway, completed in Aug 1955, replaces old timber apron built in 1870; spillway is about 140 ft long from crest to sill and rests on sand and gravel filters and rock filled steel cells; contraction joints have rubber seals; construction procedures.
Chute spillway preserves St. Anthony falls
Reinforced concrete spillway, completed in Aug 1955, replaces old timber apron built in 1870; spillway is about 140 ft long from crest to sill and rests on sand and gravel filters and rock filled steel cells; contraction joints have rubber seals; construction procedures.
Chute spillway preserves St. Anthony falls
Civ Eng (NY)
Dienhart, A.V. (author)
Civil Engineering ; 26
1956
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Tema Archive | 1988
|Concreting steep spillway chute
Engineering Index Backfile | 1967
Model Study of Stepped Spillway in Supercritical Spillway Chute
British Library Conference Proceedings | 2008
|Rock erosion of unlined spillway chute
British Library Conference Proceedings | 1997
|Design and performance of spillway chute aerators
Tema Archive | 1990
|