A platform for research: civil engineering, architecture and urbanism
Chemical stabilization cuts excavation cost
Construction of swimming pool 80×15 ft to be built in sandy and gravely soil under existing building, adjacent to footings and columns of building and adjacent also to concrete slab floor; commercial sodium silicate, certain metallic salts, calcium chloride and certain dispersing gases used to stabilize soil; excavation costs cut by 30%.
Chemical stabilization cuts excavation cost
Construction of swimming pool 80×15 ft to be built in sandy and gravely soil under existing building, adjacent to footings and columns of building and adjacent also to concrete slab floor; commercial sodium silicate, certain metallic salts, calcium chloride and certain dispersing gases used to stabilize soil; excavation costs cut by 30%.
Chemical stabilization cuts excavation cost
Pac Bldr Engr
1956
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
JAPAN - EXCAVATION: Mobile miner cuts mixed ground
Online Contents | 1997
|Application of PCF Rock Excavation to the Controlled Excavation of Cross Cuts and Galleries
British Library Conference Proceedings | 1995
|Rock Slopes: Design, Excavation, Stabilization
NTIS | 1989
Low cost vegetative stabilization of highway slope cuts and fills
Engineering Index Backfile | 1942
|Soil stabilization speeds tower footing excavation
Engineering Index Backfile | 1951
|