A platform for research: civil engineering, architecture and urbanism
Channel struts make short work of construction
System used in building 6000 sq ft school in Wayne, Mich combines standardized construction, precision formed interchangeable parts and simplified assembly; building was framed in less than 30 days and completed in about 90; roll formed members are assembled on job without any fitting in less than one third usual time; costs are no higher than for conventional construction.
Channel struts make short work of construction
System used in building 6000 sq ft school in Wayne, Mich combines standardized construction, precision formed interchangeable parts and simplified assembly; building was framed in less than 30 days and completed in about 90; roll formed members are assembled on job without any fitting in less than one third usual time; costs are no higher than for conventional construction.
Channel struts make short work of construction
Iron Age
Patton, W.G. (author)
Iron Age ; 177
1956
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Ultimate strength of short struts
Engineering Index Backfile | 1957
|Compressional Behaviour of Stainless Steel Short Struts
British Library Conference Proceedings | 1998
|Local instability in plates and channel struts
Engineering Index Backfile | 1966
|