A platform for research: civil engineering, architecture and urbanism
6.58-mi highway relocation project carried out by Bureau of Public Roads as part of 70.4-mi improvement program for Columbia Falls-Glacier Park highway in Montana; river was moved by dumping material, mostly rock, into former bed until stream was pushed over far enough to make room for road between tracks and river; slope protection plan provides full protection of road from stream during turbulent spring flood stage.
6.58-mi highway relocation project carried out by Bureau of Public Roads as part of 70.4-mi improvement program for Columbia Falls-Glacier Park highway in Montana; river was moved by dumping material, mostly rock, into former bed until stream was pushed over far enough to make room for road between tracks and river; slope protection plan provides full protection of road from stream during turbulent spring flood stage.
Move river, make road
Pac Bldr Engr
Nelson, P. (author)
1956
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Hybrids make a move to plant floors
British Library Online Contents | 2006
Classified section - Make a career move today
Online Contents | 2005