A platform for research: civil engineering, architecture and urbanism
Two structures for three-level overpass system and excavation and fill contract at southwest shore of Capitol Lake, Wash, where highway 99 meets new connection with road to Aberdeen; latter job involves deepcut through brow of hill, deep fill between cut and lake, and fill across lake itself.
Two structures for three-level overpass system and excavation and fill contract at southwest shore of Capitol Lake, Wash, where highway 99 meets new connection with road to Aberdeen; latter job involves deepcut through brow of hill, deep fill between cut and lake, and fill across lake itself.
Interchange and fill at Olympia
Pac Bldr Engr
Nelson, P. (author)
1956
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Olympia - Triathleten bei Olympia
Online Contents | 2008
Online Contents | 1991
Olympia - Grohe im Beijing Olympia-Stadion
Online Contents | 2008