A platform for research: civil engineering, architecture and urbanism
Vibrating concrete for New Oakwood Reservoir
Construction of new 5 m gal Oakwood Reservoir for Southend Waterworks Co; 5087 cu yd of concrete, of which 680 cu yd were of mass concrete, used; all of reinforced concrete was consolidated by use of internal vibrators; vibration equipment consisted of CP-219 immersion type pneumatic vibrators.
Vibrating concrete for New Oakwood Reservoir
Construction of new 5 m gal Oakwood Reservoir for Southend Waterworks Co; 5087 cu yd of concrete, of which 680 cu yd were of mass concrete, used; all of reinforced concrete was consolidated by use of internal vibrators; vibration equipment consisted of CP-219 immersion type pneumatic vibrators.
Vibrating concrete for New Oakwood Reservoir
Civ Structural Engrs Rev
1956
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Synchro Oakwood 4D Model Case Study
Wiley | 2016
|Briefing: Super tall timber – Oakwood Tower
Online Contents | 2016
|Briefing: Super tall timber – Oakwood Tower
Online Contents | 2016
|New American Tunneling Technique - NATT: Oakwood Beach Interceptor Project Contract T-13
British Library Conference Proceedings | 1993
|Comparison of surface properties of Beech- and Oakwood as determined by ESCA method
British Library Online Contents | 1996
|