A platform for research: civil engineering, architecture and urbanism
Construction of covered service reservoir in colloidal grout concrete
Colloidal grout concrete method of construction chosen for Higher Berse Service Reservoir; design principles adopted stipulated that concrete skin of reservoir be continuous and that all loads be carried on concrete skin; erection of outer and internal columns; construction of floor slab, side walls and roof. (See also - discussion p 34-50)
Construction of covered service reservoir in colloidal grout concrete
Colloidal grout concrete method of construction chosen for Higher Berse Service Reservoir; design principles adopted stipulated that concrete skin of reservoir be continuous and that all loads be carried on concrete skin; erection of outer and internal columns; construction of floor slab, side walls and roof. (See also - discussion p 34-50)
Construction of covered service reservoir in colloidal grout concrete
Instn Water Engrs -- J
Seddon, H. (author)
1956
14 pages
8 Plates
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Colloidal grout repairs concrete piles without dewatering
Engineering Index Backfile | 1960
|Design and Construction of a Covered Concrete Reservoir
Wiley | 1929
|Design and construction of a covered concrete reservoir
Engineering Index Backfile | 1929
|Large reinforced concrete covered reservoir
Engineering Index Backfile | 1921
Covered reservoir of reinforced concrete
Engineering Index Backfile | 1917
|