A platform for research: civil engineering, architecture and urbanism
Most costly item in railway maintenance said to be packing of track (tamping); methods at present in use on London Midland Region; mechanical tamper, its merits and limitations; comparative tests with smaller "off-track" tampers; use of tampers for maintaining track with long welded rails; necessity of further research suggested. (See also - discussion p 191-9; Engineering v 181 n 4707 May 25 1956 p 407)
Most costly item in railway maintenance said to be packing of track (tamping); methods at present in use on London Midland Region; mechanical tamper, its merits and limitations; comparative tests with smaller "off-track" tampers; use of tampers for maintaining track with long welded rails; necessity of further research suggested. (See also - discussion p 191-9; Engineering v 181 n 4707 May 25 1956 p 407)
Consolidation of ballast
Instn Civ Engrs -- Proc
White, I.G. (author)
1956
21 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Track maintenance machine and method for consolidation of a ballast bed
European Patent Office | 2021
|A METHOD AND MACHINE FOR CONSOLIDATION OF BALLAST OF A TRACK
European Patent Office | 2015
|Track Maintenance Machine And Method For Consolidation Of A Ballast Bed
European Patent Office | 2019
|Ballast and Ballast Maintenance
Online Contents | 2008