A platform for research: civil engineering, architecture and urbanism
Design and construction of Aden oil harbour
Layout of harbour and factors influencing design; breakwater core constructed entirely by tipping rock from Euclid wagons; special rolling of hexagonal steel piles adopted for jetties; framework of jetty was of steel sections welded together; dredging of harbour area and approach channel amounted to about 6,000,000 cu yd. (see also Instn Civ Engrs -- Proc v 5 pt 1 n 4 July 1956 p 348-83 (discussion) 383-98)
Design and construction of Aden oil harbour
Layout of harbour and factors influencing design; breakwater core constructed entirely by tipping rock from Euclid wagons; special rolling of hexagonal steel piles adopted for jetties; framework of jetty was of steel sections welded together; dredging of harbour area and approach channel amounted to about 6,000,000 cu yd. (see also Instn Civ Engrs -- Proc v 5 pt 1 n 4 July 1956 p 348-83 (discussion) 383-98)
Design and construction of Aden oil harbour
World Construction
Palmer, J.E.G. (author) / Scrutton, H. (author)
1956
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Design and construction of Aden oil harbour
Engineering Index Backfile | 1956
|Breakwater for Service Harbour, Gulf of Aden
ASCE | 2004
|DataCite | 2017
|Rittersitz Haus Aden bei Bergkamen-Oberaden
DataCite | 2017
|