A platform for research: civil engineering, architecture and urbanism
Recent developments in Gavunda hydro-electric project
Construction of derivation canal which is 1.5 mi long and has cross section area of 646 sq ft with depth of 16.4 ft when station is in operation.
Recent developments in Gavunda hydro-electric project
Construction of derivation canal which is 1.5 mi long and has cross section area of 646 sq ft with depth of 16.4 ft when station is in operation.
Recent developments in Gavunda hydro-electric project
Civ Eng (Lond)
Civil Engineering ; 51
1956
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Preliminary developments on a hydro-electric project
Engineering Index Backfile | 1923
|Engineering Index Backfile | 1921
|Hydro-electric developments in Ceylon
Engineering Index Backfile | 1924
Hydro-electric developments near Bathurst
Engineering Index Backfile | 1922
|Engineering Index Backfile | 1964