A platform for research: civil engineering, architecture and urbanism
Project, which will add 190,000 hp to British Columbia system, will consist of earth dam 2000 ft along crest and 90 ft high; dam will form reservoir to divert water into Shadow Lake which will be intake end of 6.7 mi 18-ft horseshoe tunnel; penstocks will drop water 900 ft down through power house with twin 9500 hp generating units and discharge it into Squamish River.
Project, which will add 190,000 hp to British Columbia system, will consist of earth dam 2000 ft along crest and 90 ft high; dam will form reservoir to divert water into Shadow Lake which will be intake end of 6.7 mi 18-ft horseshoe tunnel; penstocks will drop water 900 ft down through power house with twin 9500 hp generating units and discharge it into Squamish River.
"Cheakamus River project"
Eng Contract Rec
Kolher, A.A. (author)
1955
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Rockfill Dams: Kenney And Cheakamus Dams
ASCE | 2021
|Discussion of “Cooke on Kenney and Cheakamus”
ASCE | 2021
|Closure to “Huber on Kenney and Cheakamus Dams”
ASCE | 2021
|Engineering Index Backfile | 1962
Engineering Index Backfile | 1961
|