A platform for research: civil engineering, architecture and urbanism
Design problems of suspended roof construction of Olympic Games swimming pool in Tokyo
Roof's longitudinal cross section is similar to that of suspension bridge with 126-m center span and 44-m side-spans; large number of lateral suspension members consisting of double-tee steel profiles is spanned between two main cables and curved reinforced concrete walls carrying grandstands, and forms frame for steel plate roofing; theoretical calculations, description of static and dynamic model tests, structural details, cable construction, erection techniques.
Design problems of suspended roof construction of Olympic Games swimming pool in Tokyo
Roof's longitudinal cross section is similar to that of suspension bridge with 126-m center span and 44-m side-spans; large number of lateral suspension members consisting of double-tee steel profiles is spanned between two main cables and curved reinforced concrete walls carrying grandstands, and forms frame for steel plate roofing; theoretical calculations, description of static and dynamic model tests, structural details, cable construction, erection techniques.
Design problems of suspended roof construction of Olympic Games swimming pool in Tokyo
Probleme beim Entwurf einer Haengedachkonstrukton anhand des Beispiels der Schwimmhalle fuer di Olympischen Spiele 1964 in Tokio
Tsuboi, Y. (author) / Kawaguchi, M. (author)
Stahlbau ; 35
1965
21 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1936
Structural design of Olympic swimming pool
Engineering Index Backfile | 1956
Lighting olympic swimming pool
Engineering Index Backfile | 1932
Failure Investigation of Olympic-Sized Swimming Pool
ASCE | 2012
|