A platform for research: civil engineering, architecture and urbanism
Five contracting firms team up to finish 45 km of road in 80 days; specifications on subgrade, paper and plastic foil used as insulation; details on central concrete mixing plant, concreting and self-propelled paving train and jointing procedure, cross-section of layers and thicknesses of highway with tabulated course specification.
Five contracting firms team up to finish 45 km of road in 80 days; specifications on subgrade, paper and plastic foil used as insulation; details on central concrete mixing plant, concreting and self-propelled paving train and jointing procedure, cross-section of layers and thicknesses of highway with tabulated course specification.
Autobahn surfacing -- Viennese-style
World Construction
Sobotka, R. (author)
World Construction ; 18
1965
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 2001
|Production and laying of cast asphalt surfacing on Frankfurt Aschaffenburg section of Autobahn
Engineering Index Backfile | 1957
|British Library Online Contents | 2015
Online Contents | 1999
|British Library Online Contents | 1999
|