A platform for research: civil engineering, architecture and urbanism
Procedures for preliminary estimates of annual operation and maintenance costs of pumping plants through 15,000 hp were developed from studies of 174 installations; they cover direct operation and maintenance costs for pumps, motors, accessory electric equipment, miscellaneous equipment, and plant structures; factors affecting costs are discussed; nomographs are included to simplify solutions of estimating equations.
Procedures for preliminary estimates of annual operation and maintenance costs of pumping plants through 15,000 hp were developed from studies of 174 installations; they cover direct operation and maintenance costs for pumps, motors, accessory electric equipment, miscellaneous equipment, and plant structures; factors affecting costs are discussed; nomographs are included to simplify solutions of estimating equations.
Pumping plant operation and maintenance costs
ASCE -- Proc (J Irrigation Drainage Div)
Eyer, J.M. (author)
1965
22 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Bridge Operation and Maintenance Costs
Springer Verlag | 1990
|Estimating life cycle plant maintenance costs
Online Contents | 2000
|Estimating life cycle plant maintenance costs
British Library Online Contents | 2000
|Estimating life cycle plant maintenance costs
Taylor & Francis Verlag | 2000
|