A platform for research: civil engineering, architecture and urbanism
Tough specs for flathead Lake bridge
Load testing of piling driven for bridge which will span outlet of Flathead Lake in Western Montana; test measured movement in thousandths of inch; specifications required that 18-in. octagonal prestressed concrete piles must be allowed to set for not less than seven days before any test loads were applied; each loading test consisted of continuous application of load twice the design load; 108 tons were applied to each pile for period of 48 hours.
Tough specs for flathead Lake bridge
Load testing of piling driven for bridge which will span outlet of Flathead Lake in Western Montana; test measured movement in thousandths of inch; specifications required that 18-in. octagonal prestressed concrete piles must be allowed to set for not less than seven days before any test loads were applied; each loading test consisted of continuous application of load twice the design load; 108 tons were applied to each pile for period of 48 hours.
Tough specs for flathead Lake bridge
Pac Bidr Engr
1965
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Recent Disturbance in the Flathead Lake (Montana) Ecosystem
British Library Conference Proceedings | 1990
|Online Contents | 2009
Online Contents | 2009
Online Contents | 2010
Online Contents | 2010