Le percement du tunnel d'Awali, etc
Driving of Avai tunnel at Litani development in Lebanon; history, sequence of operations as well as methods used in driving 17 km long, 3.40 m diam tunnel of 25 cu m/sec water discharge are described; horseshoe tunnel cross section was adopted; reinforced and unreinforced circular profile was used when passing through poor ground; great difficulties encountered during work, caused by poor geological conditions and groundwater pressure up to 75 bars called for intense drainage as well as for soil stabilization by chemicals and cement injections.
Le percement du tunnel d'Awali, etc
Driving of Avai tunnel at Litani development in Lebanon; history, sequence of operations as well as methods used in driving 17 km long, 3.40 m diam tunnel of 25 cu m/sec water discharge are described; horseshoe tunnel cross section was adopted; reinforced and unreinforced circular profile was used when passing through poor ground; great difficulties encountered during work, caused by poor geological conditions and groundwater pressure up to 75 bars called for intense drainage as well as for soil stabilization by chemicals and cement injections.
Le percement du tunnel d'Awali, etc
Le percement du tunnel d'Awali, etc
Halwani, S. (author) / Janod, A. (author) / Lajeat, J.P. (author)
1965
4 pages
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 2010
L'emploi d'un Bouclier pour le percement d'un petit tunnel fait realiser une economie de 30%
Engineering Index Backfile | 1932
|PERCEMENT - Deux villas de vacances - Elisabeth Lemercier et Philippe Bona
Online Contents | 2010