A platform for research: civil engineering, architecture and urbanism
Boot hill for Brazos
Houston Pipe Line Co carried out construction program to stabilize eroding banks of Brazos River through which new 20 in. line crossed; 8x20 ft permeable panel supported by two 40 ft piles were set next to high bank and normal to river flow; frequent floods require inspection of panel from time to time.
Boot hill for Brazos
Houston Pipe Line Co carried out construction program to stabilize eroding banks of Brazos River through which new 20 in. line crossed; 8x20 ft permeable panel supported by two 40 ft piles were set next to high bank and normal to river flow; frequent floods require inspection of panel from time to time.
Boot hill for Brazos
Gas Age
Gas Age ; 133
1966
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1931
|Harbor improvement of Brazos River
Engineering Index Backfile | 1891
|The Lake Brazos Labyrinth Weir
British Library Online Contents | 2009
|Possum kingdom initiates Brazos development
Engineering Index Backfile | 1939
Harbor improvement of Brazos River
Engineering Index Backfile | 1892
|