A platform for research: civil engineering, architecture and urbanism
Construction of two concrete filter plants on Chicago shore of Lake Michigan involving tunnels, galleries, conduits, manifolds, and walls; only small individual pours of concrete were possible; complicated form work required; reinforced steel erected before forming was made; wall, column, and forming work described.
Construction of two concrete filter plants on Chicago shore of Lake Michigan involving tunnels, galleries, conduits, manifolds, and walls; only small individual pours of concrete were possible; complicated form work required; reinforced steel erected before forming was made; wall, column, and forming work described.
Small daily pours add up
Construction Methods Equipment
Hamrin, J. (author)
1958
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
HANDLING CONCRETE ON SMALL POURS
Online Contents | 1995
British Library Online Contents | 1992
|Taylor & Francis Verlag | 1974
Placement: Record concrete pours - A case study comparison of major concrete raft foundation pours
British Library Online Contents | 1998
|Engineering Index Backfile | 1961