A platform for research: civil engineering, architecture and urbanism
Stockholm underground railway
Southern and western parts of Stockholm underground railway have been connected; about 395,000 cu yd of rock has been blasted out, 160,000 cu yd of it from tunnels; line runs through 3900 ft of rock tunnels; total length of track in rock tunnels is 7100 ft.
Stockholm underground railway
Southern and western parts of Stockholm underground railway have been connected; about 395,000 cu yd of rock has been blasted out, 160,000 cu yd of it from tunnels; line runs through 3900 ft of rock tunnels; total length of track in rock tunnels is 7100 ft.
Stockholm underground railway
Civ Eng (Lond)
Civil Engineering ; 53
1958
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Underground Planning in Stockholm
British Library Conference Proceedings | 1993
|The underground telephone system in Stockholm
Engineering Index Backfile | 1898
|Particulate matter in the underground of Stockholm
Elsevier | 2002
|Southern Link Road Construction in Stockholm - Underground Structures
British Library Conference Proceedings | 2000
|