A platform for research: civil engineering, architecture and urbanism
Work peak reached at Scattergood
Construction work on first unit of Scattergood Steam Plant of Los Angeles Dept of Water and Power; sand, salt spray and groundwater were main problems; excavating over 3,000,000 cu yd of sand for foundations; tunnels between plant and separated pump chambers; concrete chimney; dewatering of site by three stage wellpoint system.
Work peak reached at Scattergood
Construction work on first unit of Scattergood Steam Plant of Los Angeles Dept of Water and Power; sand, salt spray and groundwater were main problems; excavating over 3,000,000 cu yd of sand for foundations; tunnels between plant and separated pump chambers; concrete chimney; dewatering of site by three stage wellpoint system.
Work peak reached at Scattergood
Western Construction
Western Construction ; 33
1958
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
General Stage reached by Construction Work
British Library Online Contents | 2004
|Peak construction reached on New Zealand's largest hydro-electric project
Engineering Index Backfile | 1961
|Ceneri Base Tunnel: Stage reached by Work
British Library Online Contents | 2011
|Gotthard Base Tunnel: Stage reached by Work
British Library Online Contents | 2010
|Finne Tunnel: Stage reached by Construction Work
British Library Online Contents | 2010
|