A platform for research: civil engineering, architecture and urbanism
Toughest specs ever written demand precision earthmoving
May n 5 p 96-100: Construction of AASHO Test Road Project near Ottowa, Ill, to rigid and exacting specifications; how contractors built up and graded earth embankments. June n 6 p 90-93: Paving with modified machines; hot mix plants; off-road paving; concrete paving; equipment used.
Toughest specs ever written demand precision earthmoving
May n 5 p 96-100: Construction of AASHO Test Road Project near Ottowa, Ill, to rigid and exacting specifications; how contractors built up and graded earth embankments. June n 6 p 90-93: Paving with modified machines; hot mix plants; off-road paving; concrete paving; equipment used.
Toughest specs ever written demand precision earthmoving
Construction Methods Equipment
Boracci, A. (author)
1958
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1994
Online Contents | 2012
ASCE | 2021
|EARTHMOVING MACHINE AND METHOD FOR OPERATING EARTHMOVING MACHINE
European Patent Office | 2023
|