A platform for research: civil engineering, architecture and urbanism
Construction of intakes and discharge works, northwest power station, Chicago
Brief illustrated description of the double-bore reinforced concrete water tunnel built behind a river dock for intake and drainage. (1200 w.) (No. 31819)
Construction of intakes and discharge works, northwest power station, Chicago
Brief illustrated description of the double-bore reinforced concrete water tunnel built behind a river dock for intake and drainage. (1200 w.) (No. 31819)
Construction of intakes and discharge works, northwest power station, Chicago
Eng Rec
1912
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1911
Engineering Index Backfile | 1946
|Wiley | 1940
|Factors in construction of water works intakes
Engineering Index Backfile | 1923
|Wiley | 1946
|