A platform for research: civil engineering, architecture and urbanism
Surfacing an existing road with steam rolled water-bound macadam
General directions and specifications. (1500 w.) (No. 29898 A)
Surfacing an existing road with steam rolled water-bound macadam
General directions and specifications. (1500 w.) (No. 29898 A)
Surfacing an existing road with steam rolled water-bound macadam
Surveyor
1912
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1908
|Engineering Index Backfile | 1916
|Cement-bound macadam for road construction
Engineering Index Backfile | 1933
|Rolled asphalt road surfacing materials
Engineering Index Backfile | 1954
|Oregon builds cement bound Macadam test road
Engineering Index Backfile | 1935