A platform for research: civil engineering, architecture and urbanism
Methods and costs of constructing two rock tunnels under the Erie canal for the Buffalo, N. Y., water works
Illustrates and describes the construction methods. (Serial. 1st part) (3000 w.) (No. 32144)
Methods and costs of constructing two rock tunnels under the Erie canal for the Buffalo, N. Y., water works
Illustrates and describes the construction methods. (Serial. 1st part) (3000 w.) (No. 32144)
Methods and costs of constructing two rock tunnels under the Erie canal for the Buffalo, N. Y., water works
Engng Con
Hollingsworth, C.H. (author)
1912
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1880
|British Library Conference Proceedings | 2005
|Construction methods and organization in constructing the Buffalo water works tunnel
Engineering Index Backfile | 1910
Methods and cost of constructing six small tunnels in earth and rock, Chicago water works
Engineering Index Backfile | 1912
|Construction of Buffalo-Fort Erie bridge
Engineering Index Backfile | 1927