A platform for research: civil engineering, architecture and urbanism
Method of solidifying chambered and fissured rock for excavation for power house and dam foundation
Describes grouting operations to secure solid foundations at Hales Bar, Tennessee River. (2000 w.) (No. 30097) (Abstract.)
Method of solidifying chambered and fissured rock for excavation for power house and dam foundation
Describes grouting operations to secure solid foundations at Hales Bar, Tennessee River. (2000 w.) (No. 30097) (Abstract.)
Method of solidifying chambered and fissured rock for excavation for power house and dam foundation
Engng Con
Tisdale, C.H. (author)
1912
Ills.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Method and cost of solidifying fissured rock by grouting, Estacada dam, Oregon
Engineering Index Backfile | 1912
|Rock foundation trench excavation device and excavation method
European Patent Office | 2024
|Engineering properties of fissured rock
British Library Conference Proceedings | 1981
|Hydraulic loading of fissured porous rock
British Library Conference Proceedings | 2000
|Stability investigation of fissured rock slopes
Engineering Index Backfile | 1966
|