A platform for research: civil engineering, architecture and urbanism
The construction of the Huai River bridge
Illustrated description of pneumatic caisson and cofferdam piers built on rock in very swift, deep water and nine spans erected by hand power. (3500 w.) (No. 30349)
The construction of the Huai River bridge
Illustrated description of pneumatic caisson and cofferdam piers built on rock in very swift, deep water and nine spans erected by hand power. (3500 w.) (No. 30349)
The construction of the Huai River bridge
Eng Rec
1912
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Yellow River Breaking into Huai River and Huang - Huai Plain Environment Evolution
British Library Conference Proceedings | 2010
|Transjurisdictional Water Pollution Management: The Huai River Example
Taylor & Francis Verlag | 2004
|Transjurisdictional Water Pollution Management: The Huai River Example
British Library Conference Proceedings | 2004
|Integrated Water-Quality Assessment of the Huai River Basin in China
British Library Online Contents | 2015
|Integrated Water-Quality Assessment of the Huai River Basin in China
Online Contents | 2015
|