A platform for research: civil engineering, architecture and urbanism
History and initial development of joint hydroelectric and inland-waterway project for regulation and utilization of upper Rhine between Basel and Strasbourg, where total fall is 160 m.; project involved construction of movable weir 180 m. long, which will raise river level by 8 m.; power and navigation canal, 6 km. long, 80 m. bottom width, 11 m. deep, with side slopes of 1 on 3; details of canal excavation and lining, construction of canal, concrete locks, etc.
History and initial development of joint hydroelectric and inland-waterway project for regulation and utilization of upper Rhine between Basel and Strasbourg, where total fall is 160 m.; project involved construction of movable weir 180 m. long, which will raise river level by 8 m.; power and navigation canal, 6 km. long, 80 m. bottom width, 11 m. deep, with side slopes of 1 on 3; details of canal excavation and lining, construction of canal, concrete locks, etc.
Utilization of Kembs Falls
L'amenagement de la chute de Kembs premiere etape du Grand Canal d'Alsace
Dumas, J. (author)
Genie Civil ; 453-460
1930
33 Figs., 11 on special plate
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.