A platform for research: civil engineering, architecture and urbanism
Steel sheetpiling carries tunnel through fault zone
Construction of Bronx River section of new 21-ft tunnel of New York water supply system; use of horizontal sheeting and extensive grouting successful in 6 months' fight to penetrate 50 ft of soft ground 500 ft below surface; steel piles supported by rings of 10-in. H-beams; steel frame used to support hammer and sheet piles for full-section enlargement; hammer riding around outside of frame ribs.
Steel sheetpiling carries tunnel through fault zone
Construction of Bronx River section of new 21-ft tunnel of New York water supply system; use of horizontal sheeting and extensive grouting successful in 6 months' fight to penetrate 50 ft of soft ground 500 ft below surface; steel piles supported by rings of 10-in. H-beams; steel frame used to support hammer and sheet piles for full-section enlargement; hammer riding around outside of frame ribs.
Steel sheetpiling carries tunnel through fault zone
Eng News-Rec
Engineering News-Record ; 108
1932
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Optimization of Tunnel Support Type through Fault Zone
British Library Conference Proceedings | 2014
|Optimization of Tunnel Support Type through Fault Zone
Trans Tech Publications | 2014
|The Bolmen Tunnel — tunnelling through the Staverhult Fault Zone
Elsevier | 1986
|Engineering Index Backfile | 1944
|An Intelligent Vehicle Transfer Robot that carries and carries out parking and departure
European Patent Office | 2019
|