A platform for research: civil engineering, architecture and urbanism
Large steel-lined tunnel shafts sunk at high speed
16-ft circular shafts for Cleveland sewer tunnel sunk 60 ft without bracing, at rate of 3.2 man-hours per foot of depth.
Large steel-lined tunnel shafts sunk at high speed
16-ft circular shafts for Cleveland sewer tunnel sunk 60 ft without bracing, at rate of 3.2 man-hours per foot of depth.
Large steel-lined tunnel shafts sunk at high speed
Eng News-Rec
Engineering News-Record ; 108
1932
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Large Diameter Segmentally Lined Shafts
British Library Conference Proceedings | 2010
|PRESSURE SHAFTS - Monitoring of steel-lined pressure shafts and tunnels
Online Contents | 2011
|TUNNEL AND SHAFT - The design of steel-lined pressure tunnels and shafts
Online Contents | 2009
|The cementing of shafts sunk through water bearing strata
Engineering Index Backfile | 1906
|Drop shafts sunk through buried tree trunks by dredging
Engineering Index Backfile | 1918