A platform for research: civil engineering, architecture and urbanism
Construction by day-labor system proves success at cost of approximately $1.50 per sq yd.
Construction by day-labor system proves success at cost of approximately $1.50 per sq yd.
Laying concrete pavements at Barrie
Can Engr
Shuter, E. (author)
Canadian Engineer ; 62
1932
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1923
|Laying concrete pavements at low temperatures
Engineering Index Backfile | 1934
|Online Contents | 1998
Barrie Christian of VideoImaging
Online Contents | 1993