A platform for research: civil engineering, architecture and urbanism
Results of field and laboratory experiments showing feasibility of making cavernous and fissured rock ridge inclosing new Panama Canal reservoir impervious, by injecting clay slurry; drill-hole experiments; moistureviscosity and moisture-time diagrams of clays of different moisture content; actual grouting results, costs and advantages; objections.
Results of field and laboratory experiments showing feasibility of making cavernous and fissured rock ridge inclosing new Panama Canal reservoir impervious, by injecting clay slurry; drill-hole experiments; moistureviscosity and moisture-time diagrams of clays of different moisture content; actual grouting results, costs and advantages; objections.
Clay grouting at madden reservoir
Eng News-Rec
Kellog, F.H. (author)
Engineering News-Record ; 109
1932
5 pages
Bibliography
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Grouting the puddle clay core at Barrow No 3 Reservoir, Bristol
British Library Conference Proceedings | 1998
|Foundation grouting of reservoir
Engineering Index Backfile | 1943
|Barrow Compensation Reservoir grouting works
British Library Conference Proceedings | 2006
|Engineering Index Backfile | 1936
|