A platform for research: civil engineering, architecture and urbanism
Grand trunk western railroad high speed suburban line, built between Detroit and Pontiac, Michigan
Complete relocation of 9 mi of busy main line and reduction of grades on additional 2 1/4 mi; provision for 4 main tracks throughout limits of improvement; construction of 19 grade-separation structures, elimination of 67 other crossings by closing streets and construction of 17 diversion tunnels. (see also Ry Age v 93 n 2 July 9 1932 p 38-40 and 51-2)
Grand trunk western railroad high speed suburban line, built between Detroit and Pontiac, Michigan
Complete relocation of 9 mi of busy main line and reduction of grades on additional 2 1/4 mi; provision for 4 main tracks throughout limits of improvement; construction of 19 grade-separation structures, elimination of 67 other crossings by closing streets and construction of 17 diversion tunnels. (see also Ry Age v 93 n 2 July 9 1932 p 38-40 and 51-2)
Grand trunk western railroad high speed suburban line, built between Detroit and Pontiac, Michigan
Can Ry Mar World
1932
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Grand trunk western railroad high speed suburban line, built between Detroit and Pontiac, Michigan
Engineering Index Backfile | 1932
Grand trunk locomotives for suburban service
Engineering Index Backfile | 1915
Automotive engineering | 1992
|Large suburban terminal built for Illinois Central railroad
Engineering Index Backfile | 1931
UB Braunschweig | 1931
|