Reconstruction of wharf at Kaslo, B.C
Rebuilding timber wharf on westerly shore of Kootenay Lake; cost $39,700; creosoted timber piling; traffic surface; quantities and costs of major items; log of condition of piling, driven in 1913-14, as found on demolition of structure in 1931; comparative ultimate costs of uncreosoted and creosoted timber wharf. (See also - discussion in n 6 June p 315)
Reconstruction of wharf at Kaslo, B.C
Rebuilding timber wharf on westerly shore of Kootenay Lake; cost $39,700; creosoted timber piling; traffic surface; quantities and costs of major items; log of condition of piling, driven in 1913-14, as found on demolition of structure in 1931; comparative ultimate costs of uncreosoted and creosoted timber wharf. (See also - discussion in n 6 June p 315)
Reconstruction of wharf at Kaslo, B.C
Eng J
Doncaster, P.E. (author)
Engineering Journal ; 15
1932
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Vatia wharf reconstruction, Fiji
Engineering Index Backfile | 1946
|Overwater pile sinking method suitable for wharf reconstruction
European Patent Office | 2024
|