A platform for research: civil engineering, architecture and urbanism
All-metal building for Richmond public works department
First all-metal office building erected in United States, in Richmond, Va, utilizes steel frame, bar joists and pressed steel plate floors and facade of aluminum and glass; structural details; building has volume of 222,244 cu ft; with accessories, it cost 22¢ per cu ft.
All-metal building for Richmond public works department
First all-metal office building erected in United States, in Richmond, Va, utilizes steel frame, bar joists and pressed steel plate floors and facade of aluminum and glass; structural details; building has volume of 222,244 cu ft; with accessories, it cost 22¢ per cu ft.
All-metal building for Richmond public works department
Eng News-Rec
Engineering News-Record ; 108
1932
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1993
|Growing up in public: PUBLIC WORKS DEPARTMENT
Online Contents | 1994
|The public works department in cities
Engineering Index Backfile | 1929
|Olga Kosterin: NSW Public Works Department
British Library Online Contents | 1992
BUILDING STUDY - Canon headquarters, David Richmond + Partners
Online Contents | 2000