A platform for research: civil engineering, architecture and urbanism
Methods of obtaining and preparing aggregates for 4,400,000 cu yd of concrete to be poured.
Methods of obtaining and preparing aggregates for 4,400,000 cu yd of concrete to be poured.
Construction of Hoover dam
Compressed Air Mag
Park, A.S. (author)
1932
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1933
|Engineering Index Backfile | 1933
|Engineering Index Backfile | 1932
|Engineering Index Backfile | 1932
|Engineering Index Backfile | 1932
|