A platform for research: civil engineering, architecture and urbanism
Special construction technique required in building waterless gas-holders
Method of erecting steel work; three-stage scaffold for erecting shell plates is hung from piston and roof trusses which are raised, one course at time, by blowing air into partially completed holder.
Special construction technique required in building waterless gas-holders
Method of erecting steel work; three-stage scaffold for erecting shell plates is hung from piston and roof trusses which are raised, one course at time, by blowing air into partially completed holder.
Special construction technique required in building waterless gas-holders
Construction Methods
Construction Methods ; 14
1932
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
WATERLESS URINAL AND WATERLESS URINAL CARTRIDGE THEREFOR
European Patent Office | 2020
|Waterless urinal and waterless urinal cartridge therefor
European Patent Office | 2021
|