A platform for research: civil engineering, architecture and urbanism
Cle elum earthfill dam and outlet works
New U S Bureau of Reclamation dam will consist of sprinkled and rolled embankment 750 ft long on crest, max height 135 ft above streambed, side slopes 3:1, crest width 35 ft; outlet works; construction plant and material supply; river and enlargement; gate-control shaft; stilling basin.
Cle elum earthfill dam and outlet works
New U S Bureau of Reclamation dam will consist of sprinkled and rolled embankment 750 ft long on crest, max height 135 ft above streambed, side slopes 3:1, crest width 35 ft; outlet works; construction plant and material supply; river and enlargement; gate-control shaft; stilling basin.
Cle elum earthfill dam and outlet works
West Construction News Highways Bldr
1932
10 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Compacting equipment for earthfill and road works
Engineering Index Backfile | 1960
|Europe's highest earthfill dam
Engineering Index Backfile | 1957
Cle Elum dam, Yakima project, Washington
Engineering Index Backfile | 1931
Failure and repair of the low-level outlet through an earthfill dam
British Library Conference Proceedings | 1994
|Building trio of earthfill dams
Engineering Index Backfile | 1949